Pipe Repair
Date
03/20/2025
Area
Virginia Beach, VA 23455
Job Description
We arrived on site and the customer pointed us towards the main water cut off valve and pressure reducing valve. We quoted the customer prices to replace the leaking valves. The customer approved the work and we proceeded to remove the leaking valves and replaced them with a new 1/4 turn ball valve for the main cut off valve. We turned the water back on and checked for leaks. After we determined there were no leaks we insulated the water lines and cleaned up the work area. The customer was happy to have no more leaks in the garage.
Atomic Team
- David Rumohr
Services
- Pipe Repair